Hoppa till huvudinnehåll

Case study Arendal

Konceptbild av Arendal

Within 5 years, the Port of Gothenburg will build a new ferry terminal for Stena Line's ROPAX operations. The terminal and quays are moved from the harbor entrance near the city out to Arendal. This is done for better traffic flow in the city, merging two terminals for efficiency as well as a more sustainable route with shorter travel distance.

In the project, it has been taken into account which initiatives can be implemented when preparing the new ferry terminal, Arendal.

Image
Karta med punkter utsatta numrerade 1 till 12
  1. Alternative fuel supply
  2. Alternative ship propulsion
  3. Digital port call
  4. Automooring
  5. Onshore power supply
  6. Electrical terminal equipment
  7. Yard optimization
  8. Smart gate / Automatic check in trucks
  9. Automatic check in passenger cars
  10. Charging stations trucks
  11. Intermodal rail terminal connection
  12. Data sharing in logistics chain

Conditions

  • 5G
  • Renewable energy supply
  • Grid capacity
  • Smart grid
  • Battery storage